# Test suite must pass on both Travis and AppVeyor before merging into `master`.
= [
"continuous-integration/travis-ci/push"
]
# Do not allow pull requests with these labels to be merged.
= [
"status: postponed",
"status: stalled",
"status: wontfix",
"status: working"
]
# This feature is rarely useful and more often problematic, so we turn it off.
= false
# Increase timeout to 5 hours as the default timeout is too short for our build
= 18000